{"page":{"id":89,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://campink.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-14\">November 14, 2026</time></p>\n<p>You hit the order button, closed the laptop, and then it came to you: the wrong size, the old address, one missing letter in the family name. It happens to everybody, usually about two hours later. This page explains how to cancel a Camp Ink order or change it, how long you have, and what to do if you are past that point. The short answer is that you have 24 hours, and the sooner you email <a href=\"mailto:support@campink.shop\">support@campink.shop</a>, the easier it is.</p>\n<section class=\"policy-summary\">\n<h2>Cancel or change: the quick facts</h2>\n<ul>\n<li><strong>Your window:</strong> 24 hours from the moment you place the order.</li>\n<li><strong>What you can change:</strong> the typed text, the size, the colour and the delivery address.</li>\n<li><strong>What it costs:</strong> nothing to cancel or change. If a new size or option has a different price, we tell you the difference first.</li>\n<li><strong>Refund for a cancelled order:</strong> cancelled orders are refunded within 7 days.</li>\n<li><strong>After 24 hours:</strong> email us anyway and we will help. If the order has been made, you still have a 60-day return with free return postage.</li>\n<li><strong>How:</strong> by email only. We reply within 24 hours on business days.</li>\n</ul>\n</section>\n<h2>Why the window is 24 hours</h2>\n<p>Everything we sell is made after you order it. There is no shelf with your hoodie already on it. Once an order goes to be printed, the tee has your size, the flag has your family&#8217;s name and the sign has your site number. Making takes 1-3 business days, and it can start quickly. The 24 hours is the stretch when we can still reach in and change the order before any ink is involved.</p>\n<p>There is a second reason. We do not send a proof before production. We print exactly what is typed. On the five Name Your Site products, the live preview on the product page is the proof, and you are the proofreader. The 24-hour window is your second chance to be one.</p>\n<p>The clock starts when the order is placed, not when you open the confirmation email. An order placed at 9 pm on Friday can be changed until 9 pm on Saturday. We answer emails on business days, so do not sit on it. Write to us the moment you notice, even on a weekend, and put the order number in the subject line.</p>\n<h2>What can be changed, and what cannot</h2>\n<table class=\"policy-table\">\n<caption>Order changes available within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">You want to change</th>\n<th scope=\"col\">Possible within 24 hours?</th>\n<th scope=\"col\">What to tell us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Typed text on a Name Your Site product</td>\n<td>Yes</td>\n<td>Each line exactly as it should print: name line, site line, Est. year</td>\n</tr>\n<tr>\n<td>Size of a tee or hoodie</td>\n<td>Yes</td>\n<td>The item and the new size, from S to 5XL</td>\n</tr>\n<tr>\n<td>Size of a blanket or garden flag</td>\n<td>Yes</td>\n<td>The item and the new size, using the size name from the product page</td>\n</tr>\n<tr>\n<td>Colour</td>\n<td>Yes</td>\n<td>The item and the colour name as shown on the product page</td>\n</tr>\n<tr>\n<td>Delivery address</td>\n<td>Yes</td>\n<td>The full new address, including postal code and country</td>\n</tr>\n<tr>\n<td>The whole order</td>\n<td>Yes, it can be cancelled</td>\n<td>That you want to cancel, and the order number</td>\n</tr>\n<tr>\n<td>Adding another product</td>\n<td>Place a new order</td>\n<td>Shipping is free with no minimum, so a second order costs no extra postage</td>\n</tr>\n<tr>\n<td>Delivery to a country we do not ship to</td>\n<td>No</td>\n<td>We deliver to the US, Canada, Australia and New Zealand only</td>\n</tr>\n</tbody>\n</table>\n<p>If what you need is not in the table, such as removing one item out of several, email us and we will help.</p>\n<h2>How to ask, in four steps</h2>\n<ol>\n<li><strong>Find the order number.</strong> It is at the top of your order confirmation email, and in <a href=\"/my-account/\">your account</a> if you have one.</li>\n<li><strong>Email us from the address you ordered with.</strong> Write to <a href=\"mailto:support@campink.shop\">support@campink.shop</a>. Put &#8220;Cancel&#8221; or &#8220;Change&#8221; and the order number in the subject line, so it stands out in the inbox.</li>\n<li><strong>Say exactly what you want.</strong> For a change, give the old detail and the new one. For typed text, write the new lines out in full, with the capital letters and punctuation exactly as you want them printed. We print what you send, so check it the way you would check a hitch pin.</li>\n<li><strong>Watch for our reply.</strong> We answer within 24 hours on business days and confirm what has been done. Hold on to that email.</li>\n</ol>\n<p>You can also <a href=\"/submit-ticket/\">submit a ticket</a> if you prefer a form. There is no phone line and no chat window. Email is the only way in, and it leaves both of us with a written record, which is what you want when the question is how a name is spelled.</p>\n<h3>A message you can copy</h3>\n<p>Something like this is all we need:</p>\n<ul>\n<li>Subject: Change, order 1234</li>\n<li>Item: Family Site Name Garden Flag, 12 x 18 in</li>\n<li>Now reads: The Holis Crew</li>\n<li>Should read: The Hollis Crew</li>\n<li>Everything else stays the same.</li>\n</ul>\n<h2>Four changes we see all the time</h2>\n<h3>The missing letter</h3>\n<p>Someone types &#8220;The Holis Crew&#8221; on the Family Site Name Garden Flag and notices two hours later, when the confirmation email is forwarded to a sister who can spell. Two hours is well inside the window. One email with the corrected name line and the order number, and the flag is made with both letters. No charge, no return, no awkward flag.</p>\n<h3>The bigger blanket</h3>\n<p>You ordered a fleece blanket in 50 x 60 in. That evening you measured the bench by the fire ring and realised the 60 x 80 in is the one that covers two people. Email us within 24 hours with the item and the new size. The larger blanket costs more, so we reply with the difference before we change anything, and the change goes through once you agree.</p>\n<h3>The hoodie you second-guessed</h3>\n<p>You were between XL and 2XL on the Chairs Round the Ring Hoodie and picked XL. Then you held a tape against the hoodie you live in on closing weekend and it is clearly a 2XL. Email us within the window and ask for the 2XL. It costs $2 more, and we will say so before we go ahead. The <a href=\"/size-guide/\">Size Guide</a> walks through that measuring trick, and it works even better before you order.</p>\n<h3>The crew order with one unknown</h3>\n<p>A camp crew of six wants Camp Crew Roles Tees: Fire Boss, Back-In Spotter, Camp Cook, Marshmallow Chief and two more, in six sizes. Five people answered the group text. The sixth is somewhere without a signal. You have two sensible choices. Order the five you know now and order the sixth separately when the answer arrives. Shipping is free on both, so you lose nothing. Or order all six with your best guess and change that one size by email if the reply lands inside 24 hours. If it lands later than that, the guess can still be swapped under the return policy after it arrives.</p>\n<h2>Cancelling the whole order</h2>\n<p>If you want to call the whole thing off, email us within 24 hours of placing the order and say so. Include the order number. We confirm the cancellation by email.</p>\n<p><strong>Cancelled orders are refunded within 7 days.</strong> The refund goes to your original payment method, or to store credit if you prefer. Store credit never expires, which is handy if you only cancelled because you ordered the wrong thing and plan to order the right one next week. The money side is laid out in full in our <a href=\"/refund-policy/\">Refund Policy</a>.</p>\n<p>You do not need to give a reason for cancelling. If the reason is something we could fix with a change instead, such as a different size, a different address or one corrected line of text, tell us and we will change the order and save you starting over.</p>\n<h2>When more than 24 hours have passed</h2>\n<p>The window is closed, and your order may already be in the making. Email us anyway and we will help with whatever can still be done. We cannot promise a change at that stage, because a printed sign cannot be unprinted.</p>\n<p>What you can count on is the return policy. Every Camp Ink product can be returned within 60 days of delivery, for any reason, and that includes personalised items. We pay the return postage with a free return label, also when you simply changed your mind. So the fallback looks like this:</p>\n<ol>\n<li>Let the order arrive.</li>\n<li>Email us within 60 days of delivery and tell us what is wrong with it for you: wrong size, wrong wording, no longer needed.</li>\n<li>Send it back with the free return label.</li>\n<li>Receive your refund within 7 days of us receiving the return, and reorder the right version whenever you like.</li>\n</ol>\n<p>The full steps are in the <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>. It takes longer than a quick change by email, which is why we keep nudging you towards the first 24 hours.</p>\n<h3>A wrong address after the window</h3>\n<p>This one is worth an email as soon as you notice, whatever the clock says. Tell us the order number and the correct address and we will help. If the order was a gift going to friends in Canada, Australia or New Zealand, double-check the postal code format for that country while you are at it. Our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page has more on addresses, including seasonal sites and campground offices.</p>\n<h2>Changing the wording, not fixing a typo</h2>\n<p>Not every text change is a spelling mistake. Sometimes you order a sign with the family surname and decide that evening you would rather not have it at the road. That is your call, and both choices are fine. Within 24 hours you can swap the name line for something else at no charge. The name line takes up to 16 characters, the site line is optional and also takes up to 16, and the Est. year is optional and runs from 1950 to 2026.</p>\n<p>Ideas that fit: &#8220;Nana &amp; Pop&#8217;s&#8221;. &#8220;Rolling Home&#8221;. First names. The rig&#8217;s own name, if it has one. A site nickname the whole loop already uses. Or the Est. year standing by itself. Count the characters before you email, spaces included, so the new line fits.</p>\n<p>If you ordered the matching set (the tee, mug, blanket, garden flag and metal sign all take the same typed lines), remember to tell us whether the change applies to every item or only one. A flag that says one thing and a sign that says another is a conversation starter, but probably not the one you wanted.</p>\n<h2>If we have to cancel your order</h2>\n<p>If we are ever unable to make an order as you placed it, we email you to explain, using the address on the order. A cancelled order is refunded within 7 days, to your original payment method or to store credit if you prefer.</p>\n<h2>A two-minute check before you order</h2>\n<p>The best change request is the one you never have to send. Before you pay, run down this list with the cart open.</p>\n<ul>\n<li>Read every typed line out loud, slowly. Typos hide from silent reading.</li>\n<li>Check the site number against something official, not against memory.</li>\n<li>Confirm the Est. year with the person who would know.</li>\n<li>Check each tee and hoodie size against a garment that person already owns. The <a href=\"/size-guide/\">Size Guide</a> shows how.</li>\n<li>Check the blanket or flag size by name: 40 x 50 in, 50 x 60 in or 60 x 80 in for blankets, 12 x 18 in or 28 x 40 in for garden flags.</li>\n<li>Read the delivery address top to bottom, including the postal code and country.</li>\n<li>Make sure the email address is one you read, because the confirmation goes there.</li>\n</ul>\n<p>Then, when the confirmation email arrives, read it once more. If something is off, you have 24 hours and you know where to find us.</p>\n<h2>Get in touch about an order you just placed</h2>\n<p>Email <a href=\"mailto:support@campink.shop\">support@campink.shop</a> with your order number. Support is by email only, and we reply within 24 hours on business days. For general questions, try the <a href=\"/faqs/\">FAQs</a> or the <a href=\"/help-center/\">Help Center</a>. To see where an order is, use <a href=\"/order-tracking/\">Order Tracking</a>.</p>\n<p>Camp Ink, 219 Baer Creek Dr, Kaysville, UT 84037, US.</p>\n","visible_characters":10671,"meta_description":"Fix the typed lines, size, colour or address on a Camp Ink order within 24 hours, or cancel it. Cancelled orders are refunded within 7 days. Here is how to ask.","parent":null,"published_at":"2026-11-13T23:41:22+00:00","updated_at":"2026-11-13T23:41:22+00:00"}}